TAG

#Plaiul Fagului

2 articles
Two officials stand on the concrete slab of a new culvert at a road worksite; behind them, a freshly poured concrete wall, excavated earth and the old gravel road climbing among the trees.
PUBLIC SERVICES

35 million lei for the road to Plaiul Fagului: what is changing in Rădenii Vechi

Ungheni district president Dionisie Ternovschi and the district council's head of construction, Diana Rogovschi, filmed the state of the works on 10 July on the access road to the „Plaiul Fagului” reserve, in the village of Rădenii Vechi. The roughly 35-million-lei worksite has reached the culverts and drainage stage; the gravel road is getting a new foundation, concrete gutters and almost two kilometres of pavement. Placing the site footage next to the procurement document shows how much it costs, who is building it and what the project actually involves.

Ion Calmis·10 July 2026· News
A Centru Development Agency representative in a hi-vis vest studies plans with two men at a construction site; behind them, the metal frames of the new Ungheni market’s pavilions.
PUBLIC SERVICES

ADR Centru checked three sites in Ungheni: the market, the French Park and a 35-million-lei road to Plaiul Fagului

The Centru Regional Development Agency — the body through which the state spends money from the National Fund for Regional and Local Development — inspected three building sites in Ungheni district on 18 June. Alongside the already-known agri-food market and French Park, a third project surfaced: rebuilding the access road to the “Plaiul Fagului” reserve, worth about 35 million lei. Together it is tens of millions in public money — which the official statement no longer puts into figures.

Ion Calmis·18 June 2026· News
2/3 confirmed · PEOPLE — pending· got a tip? write to us →